Precast panels are
formed up in every available space of the second floor of the East
Crescent. Each panel is cast as close as possible to its final
location. This pour on August 19. included panel #54, an outside panel
for Unit 6, and panel #44 [in the background], a doorway panel for Unit
7. [Photo & text: SA]


The concrete is
raked into place by planning intern Scott Airlie and workshopper Taylor
Mitchell. [Photo & text: SA]


A fresh batch of
concrete is hoisted into position. Everybody got out of the way, while
construction foreman Ray Shong and habitat manager Dave Tollas are
guiding the bucket into position. [Photo & text: SA]


Once the bucket is
in place everyone rushes back into action. [Photo & text: SA]


The concrete mixer
crew is hosing down the truck. Volunteer Daisuke Nakamishi, driver
Gabriel Hendrix and crew-leader Jeff Masty. [Photo & text: SA]


The crew is
finishing up the panel. [Photo & text: SA]


Another pour
complete and workshopper Taylor Mitchell is sweeping up. [Photo & text:
SA]