CONCRETE BRIDGE (Continued from 9/24/03): The form for the concrete bridge behind Unit 6 of the East Crescent has been removed.
[Photo: aa & text: kh]


The bridge is on the second floor level. A form remains for a stairway that will eventually lead to the third floor.
[Photo: aa & text: kh]


The excess silt is washed away from the dry concrete. The silt remaining on the bridge gives the bottom a unique texture and color.
[Photo: aa & text: kh]

Leave a Reply

Your email address will not be published.

You may use these HTML tags and attributes:
<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>