? Construction continues at the Visitors center entrance ADA ramp.
The connecting walkway from the visitors parking lot to the upper part of the ramp has been formed up and a small graveled walk-way was prepared right next to it for visitors access.


? The actual concrete pours are a favorite part of the construction team’s responsibilities and the long ramp is worked in high spirits and with vigorous activity.


? When we look at the ramp from the visitors center window, we can see this part of the concrete work at the very entrance to the visitors parking lot.
In the foreground, on the lowest level of the ramp, we can see the first signs of railing posts.
This report will proceed with photos of the metalwork for the railing and it’s installation.