? Today, we report on the concrete pour of a staircase for Arcosanti’s new Visitor’s pathway. In this photo, you see the process of mixing concrete. Buckets are filled with sand, gravel and cement, and the final ingredient, water, is sprayed directly in the concrete mixer.


? Afterwards, the concrete is transported with wheel-barrows to the formwork (see report from April 22. 2009). Shovels are used for spreading the thick mixture.


? These photos show some of the finishing details for this pour. In the upper images, Construction crew-member, Andrew Woodard, is showing a workshop-participant how to vibrate the concrete for pushing the air-bubbles out, and how to use a trowel for smoothing out the surface.
The bottom left picture shows screeding and leveling the slab of the staircase. In the last photo, you see the staircase connecting to the existing pathway.


Leave a Reply

Your email address will not be published.

You may use these HTML tags and attributes:
<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>