? Work continues on the AOT ramp which leads from the visitors parking lot to the Crafts III building.
The railing posts on the first and second part of the ramp have been leveled and now extensions are welded onto each post.
Workshop participant Stefano Massa learns the welding process.


? Brian Fritz and Stefano work through every step to get a perfectly bent end of the hand rail.


? Meanwhile the construction team, with teamleader Andrew Woodard and workshop participants Andrew Chesley and Ryan Weinman, is in the process of installing formwork for a sloped concrete retaining wall below the second level.
We continue on 2/27/09 with a report on the concrete pour on part of this retaining wall.