aquaponic

The wall for the fish tank of the aquaponic system in the camp green house is poured. The construction crew has moved the concrete mixer and raw materials for concrete to the camp green house area.
[Photo & Text: aa]



aquaponic

Each batch in the concrete mixer makes 4 wheel barrels of concrete each time.
[Photo & Text: aa]

aquaponic

The wall for the fish tank of the aquaponic system in the camp green house is poured. The construction crew has moved the concrete mixer and raw materials for concrete to the camp green house area.
[Photo & Text: aa]



aquaponic

Each batch in the concrete mixer makes 4 wheel barrels of concrete each time.
[Photo & Text: aa]



aquaponic

February workshoppers work hard, shoveling sand and gravel for concrete. Sean Sciubba (left), Anita Punja and Haley Byrd (right).
[Photo & Text: aa]



aquaponic

The concrete is poured into the formed wall.
[Photo & Text: aa]



aquaponic

Construction crewmembers and agriculture crewmembers work together in the limited space of the green house. Concrete is shoveled out of the wheel barrel in to the narrow frame.
[Photo & Text: aa]

Leave a Reply

Your email address will not be published.

You may use these HTML tags and attributes:
<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>