This continues the report of the remodel project of bathrooms in the Colly Soleri Music Center on 6/6. [left] In the large shower room the tile design on the floor is coming along and the walls have been prepared for tiles. [right] The toilette and light fixture have been installed in the small bathroom.
[Photo: Yuki Yanagimoto & text: sa]

?

This continues the report of the remodel project of bathrooms in the Colly Soleri Music Center on 6/6. [left] In the large shower room the tile design on the floor is coming along and the walls have been prepared for tiles. [right] The toilette and light fixture have been installed in the small bathroom.
[Photo: Yuki Yanagimoto & text: sa]



?

Opaque glass is installed between the two rooms and each room now has a small corner sink.
[Photo & text: sa]



?

This photo shows the larger shower room with hardware for handicap access installed, as well as a door to a small utility room. The walls are straight, distortion is due to camera limitation in a small room.
[Photo & text: sa]



?

Project leader for this remodel, Mark Baris, installs the hardware in the handicap accessible shower stall. The report on this project will continue on 6/13.
[Photo & text: sa]

Leave a Reply

Your email address will not be published.

You may use these HTML tags and attributes:
<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>