To continue the report from 2/18: The wires are pulled from the heat-duct tunnel into the new Utility Room at the lowest level of Unit 10 of the East Crescent Complex. Electrician Michael Bittman, aka Dr. Sparks.
[Photo: Scott Riley & text: sa]



?

Local contractor, electrician Sean Wright, tightens fuses in one of the panel boxes in the utility room. Wires are in place and will be connected to individual breaker locations.
[Photo & text: sa]



?

The electricity was turned off site wide to connect the outside power line to a switch box in the heat duct tunnel and from there to the utility room.
[Photo: Yuki Yanagimoto & text: sa]



?

A forest of wires has become organized, each connected to a designated location. More to come.
[Photo & text: sa]