? This continues the report from 8/16 of interior finishing of a previous dormatory space on the third floor of the East Crescent Complex Unit 5.
[from upper left] The kitchen is almost complete, the stove still has to be installed. Meanwhile the walls and floorboards are painted. ? This continues the report from 8/16 of interior finishing of a previous dormatory space on the third floor of the East Crescent Complex Unit 5.
[from upper left] The kitchen is almost complete, the stove still has to be installed. Meanwhile the walls and floorboards are painted.


? [from upper left] The kitchen is complete and moved in. The space infront of the kitchen has become a comfortable dining and TV room.


? [from upper left] A few stairs lead to the upper part of the apartment, a large studio with bedroom on one side, divided by book shelves and a lovely living area. The ceiling slopes up, giving a light and airy feeling to this space.

Leave a Reply

Your email address will not be published.

You may use these HTML tags and attributes:
<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>