? This continues the report from 8/21 and 8/23 about construction of a new shed for ceramic bell storage. This shed is located right next to the kiln on the west side of the ceramics apse.
The steel roof structure is completed and fire-proof side panels have been installed to close the sides of the roof structure.


? from left: On the inside of the shed the crew fastened struts to the walls for a shelving system.
The doors have been hung and some shelving has been installed. More to come.