? This continues the report from 6/4/07, of interior work in the small bathroom of the south-east apartment in Unit 10.
A tile mosaic of the 1969 design of Arcosanti will be installed on the curved inner wall of the bathroom.Planning coordinator Dan Kelliher custom cuts pieces of tile for this beautiful mosaic and assembles them on a large table in the front room. ? This continues the report from 6/4/07, of interior work in the small bathroom of the south-east apartment in Unit 10.
A tile mosaic of the 1969 design of Arcosanti will be installed on the curved inner wall of the bathroom.Planning coordinator Dan Kelliher custom cuts pieces of tile for this beautiful mosaic and assembles them on a large table in the front room.


? [from upper left] At the same time construction crew Melissa Soluski and volunteer JiHye Son install tiles on the north- and east wall of the bathrrom.


? [from upper left] As Melissa and JiHye proceed with general tiles Dan starts to install parts of the mosaic.
Some of the curvature in the images is due to the photos taken in a very tight space.
This report continues on 6/13/07.