? This continues the report from 5/14/07 about the installation of a new set of solar panels.
A complicated collection of connectors is pre-assembled by workshop participants JiHye Son, Rebecca M. and Jose Masaoy.
The panels are unpacked and moved into location.
Rebecca reaches through the greenhouse windows to help. ? This continues the report from 5/14/07 about the installation of a new set of solar panels.
A complicated collection of connectors is pre-assembled by workshop participants JiHye Son, Rebecca M.and Jose Masaoy.
The panels are unpacked and moved into location.
Rebecca reaches through the greenhouse windows to help.


? Workshop participant Sylva Tentori assembles some of the connectors.
Construction crew leader David Tollas and workshop participant Fernando Lomasto lift the panels up to site electrician Dr. Sparks.
Rebecca is on the inside of the greenhouse to help mount the back of the panels.


? Rebecca installs the individual wiring and wire connection between the panels.
All the panels are in place.

Eight panels with 160 Watt capacity were donated by PTL [Photovoltaic Testing Laboratory], which is a part of Arizona State University.
This report continues on 5/18/07.

Leave a Reply

Your email address will not be published.

You may use these HTML tags and attributes:
<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>