? Work continues on the new visitors entrance on the north side of Crafts III with installation of handrails next to the new entrance ramp.
Metalshop volunteer Darina Trendafilova and construction intern Vidhushekhar check the level of each post before welding it into place.


? The individual posts are connected to weldplates imbedded in the top of each concrete retaining wall. Construction intern Vidhushekhr learnes basic welding technique by helping with the actual installation of this path railing.


? A handrail is connected to the posts and workshop participant Erik Cote grinds the welded connections between the individual pieces of rail smooth before the railing receives a coat of metal primer.
The report on construction and welding in this area continues on 10/29/07.