? Interior construction proceeds on a first floor apartment of Unit 10 in the East Crescent.
To continue the report from 9/10/07, we start with a plan of the apartment.
The main room is located in the Unit 10 light scoop with windows facing east and south. Note the curved wall right next to a recessed back entrance/exit.
The main door can be entered from a, yet to be tiled, porch area. Upon entering an open kitchen area is on your right and a bathroom with shower right next to the kitchen.


? The back door leads to a staircase on the east side of the S.O.D. office unit.


? Construction crew Melissa Soluski installs insulation material prior to dry wall.
This report continues on 10/3/07 with drywall installation.


Leave a Reply

Your email address will not be published.

You may use these HTML tags and attributes:
<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>