? Last week’s pour for the heat duct tunnel wall was a great success. The concrete for the retaining wall came out smooth and uniform and is holding up strong. Rocks, soil, and insulation materials filled up the trenches surrounding the finished area of the heat duct tunnel.


? Last Thursday, construction staff and the new workshop participants poured concrete for the beginning of the footings that lead down the slope. Concrete is transported with wheel barrows onto the scaffolding and then scooped into buckets to be passed down and poured into the formwork.


? As we wait for the concrete to cure, the construction crew will continue preparing the groundwork for the next footings. We will continue this report next week.