This continues the report from 9/8/2010.

The form work was completed, for the first level of the energy apron greenhouse, Phase I.

Our mixer truck delivered the concrete that was batched by our on-site plant.

As the freshly cast slab is screeded off, Angus Gluck works on the slab to give the initial finish with a magnesium float [bull float]

The finished slab measures 12 feet wide x 40 feet long.

Sealer has been applied to allow the slab to cure gradually.

For more images of this pour see report from 8/24/2010.

 